Cart: 0 item (s) - £0.00

Manmat stopping line/ long lead

Stock Status: Out Of Stock
Product Brand: Manmat
Size
Colour
£20.00
£30.00
Sorry, this item is currently out of stock
But will be placed on back order so please allow up to 28 days for delivery thank you


You Will Earn 20 points which is the equivalent of £0.20
Stopping line is made of soft polypropylene. This material reduce friction during pass through the palm and is also non-soaking. The line was specially developed for this purpose. Next advantage is minimum weight.
 
Available colors
A : color mix
 
Available sizes
S : 5 metres (16.5 ft)
M : 10 metres (33 ft)

 

Write an online review and share your thoughts with other shoppers!

Be the first to review this product

Free UK Delivery
Orders Over £100